CS-20 Coal Mine: Rio Tinto – Technofast Case Study
Site
Rio Tinto – Hunter Valley
Original Set-Up
Heavy steel TEE Bars and jacks need to be lifted and installed to tension the ropes and then removed.
Issues Experienced
- Manual Handling Concerns
- Rating concerns with 1” UNC bolts used with jacks
- OH&S concerns due to working at heights
Installation Time
Old Method = 2 hours 30 minutes (2-3 personnel) per rope
New Method = 45 minutes(2 personnel) per rope
Time Saving = 1 hours 45 minutes
Application
Intermediate Boom Rope Support Tensioners
Technofast Product Used
EziTite IBS Tensioners — EZI-IBS-212X4-000.
Benefits Experienced
- Easy installation and handling
- Removed major OH&S concerns
- Ability to check rope loads quickly and easily
Feedback Recieved
“Has received great acceptance from the on-site maintenance crew.” – Hunter Valley User